new Try our new search

MD : PC44

  • Customer Protection
  • Data Access
  • Distribution System Planning
  • Electric Vehicle Charging and Infrastructure
  • Electric Vehicles (Non-Infrastructure)
  • Energy Storage
  • Grid Modernization
  • Interconnection
  • Net Metering
  • Rate Design (all)
  • Time Varying Rates
  • Value of DER
Status: Active
    New filing added 7 days ago

  • Latest Filing:

    15 Nov 2024
  • Opened:

    26 Sep 2016

In The Matter Of Transforming Maryland's Electric Distribution Systems To Ensure That Electric Service Is Customer-Centered, Affordable, Reliable And Environmentally Sustainable In Maryland.

Source - Original Docket

Start a free 7 day Insight Engine™ trial

Insight Engine™ allows you to search, track, and collaborate on energy legislation and regulatory proceedings from across the country:

  • Complete coverage of every state Public Utility Commission (PUC), all 50 state legislatures, and US Congress
  • Advanced search and personalized email notifications
  • Expert insights from our policy team

Already a customer? Sign in or Register

Filings for MD: PC44

Example Filing

Start a free 7 day Insight Engine™ trial

This docket has 404 filings. Quickly identify the filings that matter:

  • Search the complete text of every filing (all pdfs, word docs, and more)
  • Filter by filing party, filing type, and more
  • Preview or download a copy of any document

Already a customer? Sign in or Register