MA : EFSB15-01

Status: Inactive
    No filings in the last 90 days

  • Latest Filing:

    07 Feb 2018
  • Opened:

    13 Mar 2015

Petition Of Exelon West Medway, Llc And Exelon West Medway Ii, Llc To Construct And Operate A 200-Mw, Dual-Fuel Oil, Simple-Cycle, Quick-Start Generating Facility Located At The Existing West Medway Generating Station Site On Summer Street, In Medway, Massachusetts. Consolidated With Petition Of Exelon West Medway Llc And Exelon West Medway Ii Llc, Pursuant To G.L. C. 40A, ยง 3, For Certain Exemptions To The Zoning Bylaws Of The Town Of Medway To Construct A 200 Megawatt Generation Facility In Medway, Massachusetts.

  • Regulated Service:

    Gas Pipelines and Safety
  • Major Parties:

    Exelon West Medway LLC
  • Assignees:

    SEDOR and M. KATHRYN
  • Docket Type:

    Siting/DTE
Source - Original Docket

Start a free 30 day PowerSuite trial

PowerSuite allows you to search, track, and collaborate on energy legislation and regulatory proceedings from across the country:

  • Complete coverage of every state Public Utility Commission (PUC), all 50 state legislatures, and US Congress
  • Advanced search and personalized email notifications
  • Expert insights from our policy team

Already a member? Sign in or Register

Filings for MA: EFSB15-01

View or Download
any Filing

Start a free 30 day PowerSuite trial

This docket has 538 filings. Quickly identify the filings that matter:

  • Search the complete text of every filing (all pdfs, word docs, and more)
  • Filter by filing party, filing type, and more
  • Preview or download a copy of any document

Already a member? Sign in or Register