new Try our new search

IN : 45002-NONE

  • Energy Storage
  • Microgrids
Status: Inactive
    No filings in the last 90 days

  • Latest Filing:

    30 May 2018
  • Opened:

    30 Oct 2017

Petition Of Duke Energy Indiana, Llc For The Approval Of A Solar-Powered Generating Facility And Battery Energy Storage Facility To Be Located At Camp Atterbury (“Camp Atterbury Microgrid”) And A Battery Energy Storage Facility To Be Located In Nabb, Indiana (“Nabb Battery”) As Clean Energy Projects Under Indiana Code 8-1-8.8; Authorization For Timely Recovery Of The Associated Construction And Operating Expenses Through The Company’s Renewable Energy Project Rider 73; Approval To Defer Costs Associated With The Camp Atterbury Microgrid And Nabb Battery Until Such Costs Are Reflected In Duke Energy Indiana, Llc’s Rates And Charges; And Approval Of A New Depreciation Rate Specific To The Proposed Camp Atterbury And Nabb Battery Energy Storage Facilities

  • Regulated Service:

    Electricity
  • Major Parties:

    Duke Energy Indiana, LLC
  • Docket Type:

    Clean Energy Project
  • Official Status:

    Decided
Source - Original Docket Search Page

Start a free 7 day Insight Engine™ trial

Insight Engine™ allows you to search, track, and collaborate on energy legislation and regulatory proceedings from across the country:

  • Complete coverage of every state Public Utility Commission (PUC), all 50 state legislatures, and US Congress
  • Advanced search and personalized email notifications
  • Expert insights from our policy team

Already a customer? Sign in or Register

Filings for IN: 45002-NONE

Example Filing

Start a free 7 day Insight Engine™ trial

This docket has 27 filings. Quickly identify the filings that matter:

  • Search the complete text of every filing (all pdfs, word docs, and more)
  • Filter by filing party, filing type, and more
  • Preview or download a copy of any document

Already a customer? Sign in or Register