classic Go back to classic search

WI : 1490-CE-105

Status: Inactive
    No filings in the last 90 days

  • Latest Filing:

    07 Nov 2018
  • Opened:

    16 Mar 2015

Application Of Cumberland Municipal Utility, As An Electric Public Utility, For Authority To Replace Existing Cooling Tower Facilities At Its Existing Generation Plant, Located In The City Of Cumberland, Barron County, Wisconsin

  • Regulated Service:

    Electricity
  • Major Parties:

    Cumberland Municipal Utility (1490)
  • Assignees:

    James Lepinski
  • Official Status:

    Closed
Source - Original Docket

Start a free 7 day Insight Engine™ trial

Insight Engine™ allows you to search, track, and collaborate on energy legislation and regulatory proceedings from across the country:

  • Complete coverage of every state Public Utility Commission (PUC), all 50 state legislatures, and US Congress
  • Advanced search and personalized email notifications
  • Expert insights from our policy team

Already a customer? Sign in or Register

Filings for WI: 1490-CE-105

Example Filing

Start a free 7 day Insight Engine™ trial

This docket has 13 filings. Quickly identify the filings that matter:

  • Search the complete text of every filing (all pdfs, word docs, and more)
  • Filter by filing party, filing type, and more
  • Preview or download a copy of any document

Already a customer? Sign in or Register