classic Go back to classic search

WA : UE-150520

Status: Inactive
    No filings in the last 90 days

  • Latest Filing:

    30 Jul 2015
  • Opened:

    31 Mar 2015

Annual Filing By Avista Corporation To Review And Confirm Power Cost Deferrals In The 2014 Energy Recovery Mechanism. In Sum, Power Costs Were Lower Than The 2014 Baseline By Approximately $9.5 Million. This Was Primarily Due To Increased Hydro Generation And Reduced Thermal Generation. This Increased The Deferral Account In The Rebate Direction By $4.1 Million, Including $80,000 In Interest, To A Total Of $14.1 Million.

  • Regulated Service:

    Electricity
  • Major Parties:

    Avista Corporation
  • Assignees:

    Ball, Jason (UTC)
  • Docket Type:

    Staff Investigation
  • Official Status:

    Closed
Source - Original Docket

Start a free 7 day Insight Engine™ trial

Insight Engine™ allows you to search, track, and collaborate on energy legislation and regulatory proceedings from across the country:

  • Complete coverage of every state Public Utility Commission (PUC), all 50 state legislatures, and US Congress
  • Advanced search and personalized email notifications
  • Expert insights from our policy team

Already a customer? Sign in or Register

Filings for WA: UE-150520

Example Filing

Start a free 7 day Insight Engine™ trial

This docket has 4 filings. Quickly identify the filings that matter:

  • Search the complete text of every filing (all pdfs, word docs, and more)
  • Filter by filing party, filing type, and more
  • Preview or download a copy of any document

Already a customer? Sign in or Register