classic Go back to classic search

CA : A1404014

  • Electric Vehicle Charging and Infrastructure
Status: Inactive
    No filings in the last 90 days

  • Latest Filing:

    06 Apr 2017
  • Opened:

    11 Apr 2014

Application Of San Diego Gas & Electric Company (U902E) For Approval Of Its Electric Vehicle-Grid Integration Pilot Program.[Per D16-01-045 This Proceeding Was De-Consolidated As Of 1/28/16 Sbf 4/26/16] [Proceedings A.14-04-014 And R.13-11-007 Are Consolidated By Ruling Of September 29, 2014.]

  • Regulated Service:

    Electricity
  • Major Parties:

    San Diego Gas & Electric Company
  • Assignees:

    ALJ: John S. Wong (Assigned Apr 24, 2015) and COMMISSIONER: Carla Peterman (Assigned May 2, 2014)
  • Docket Type:

    Ratesetting
  • Official Status:

    Closed
Source - Original Docket

Start a free 7 day Insight Engine™ trial

Insight Engine™ allows you to search, track, and collaborate on energy legislation and regulatory proceedings from across the country:

  • Complete coverage of every state Public Utility Commission (PUC), all 50 state legislatures, and US Congress
  • Advanced search and personalized email notifications
  • Expert insights from our policy team

Already a customer? Sign in or Register

Filings for CA: A1404014

Example Filing

Start a free 7 day Insight Engine™ trial

This docket has 409 filings. Quickly identify the filings that matter:

  • Search the complete text of every filing (all pdfs, word docs, and more)
  • Filter by filing party, filing type, and more
  • Preview or download a copy of any document

Already a customer? Sign in or Register